26 October to 1 November 2026
A board of work in flight, and two new connections
Work in flight can now be seen as a board, and every piece of work links back to the tool it lives in. Vanta and Kiro joined the list of connected systems.
- 01
Work in flight as a board
You can view work in flight as a board, flat or grouped by goal, including on a phone.
Cards show their checks and age, and move while something on them is live. Dragging a card to another column answers it, stops it or sends it again. A team's own work has the same board view.
- 02
Work that links to its source
Every pull request or ticket named in the product now shows its source, links out and previews on hover.
A work card links to each tool the work lives in, such as GitHub or Jira. This saves a search when you want to check the detail behind a line on a goal or a board.
- 03
Compliance progress from Vanta
You can connect Vanta to measure progress through each compliance framework.
The connection also brings in control checks, open issue history and remediation without an owner. It is in preview. Once connected, these numbers can be used as measures on a goal.
- 04
Kiro usage as measures
You can bring daily Kiro usage in from your own cloud account and use it as a measure.
This adds Kiro to the coding tools whose use and cost you can follow in one place. The connection is in preview, and set-up is on the Integrations page.
- 05
A number and key results
A level of your goal hierarchy can now be measured by a number and by key results together.
Previously a level took one or the other. The choice is made once in settings, so goals at that level behave consistently. It suits companies that track a headline number alongside quarterly key results.